ESEA Overview
Current ESEA project portfolio snapshot.
Sourceinformation
Sourceinformation
Selected project source:
Built from current NAS project reports, deliverables, correspondence, GIS and field evidence, reconciled with the accepted live Metadata Log snapshot. Activity alone is not treated as proof that a project is live.
Detailed-view map: use the current controlled ESEA Ecological Constraints Map once that App output is produced consistently. Until then, use the most suitable current project map and identify what it shows.
Project OneNote and the live Metadata Log are active scheduled-sync sources. Ambiguous OneNote pages and unresolved Metadata Log conflicts are skipped or retained for QA without blocking supported updates. The dashboard refreshes on its scheduled evidence-review cycle rather than continuously.
Dashboard Sync
Each scheduled evidence review keeps Project Briefings focused on confirmed current work and refreshes Live Proposals from proposal-only NAS records. A proposal moves to Project Briefings when substantive project delivery is evidenced; verified closed or inactive projects move to Archived Project Briefings.
The dashboard displays the current shared rhythm; it does not control schedule times. Automated internal briefing email or Power Automate configuration will be handled separately when that workflow is developed.
Projects completed by month
Project status
Recently completed projects
| Project | Client | Service | Completed | Lead |
|---|
Service mix
Recently completed deliverables
| Deliverable | Project | Client | Service | Completed | ESEA Consultant |
|---|
Delivery throughput
Live team work by service
Deliverables by LGA
Service status
| Service | Deliverables | Completed | Live | Completed / Live / Unverified mix |
|---|
New clients by month
Largest client portfolios
Client portfolio
| Client | Projects | Live | Completed | Services | Latest activity |
|---|
Indicative location view. One primary project-level location is read from the accepted Metadata Log mapping table. Deliverable rows never create duplicate pins. Text-only and withheld locations remain listed for reconciliation, and some published pins are locality- or region-level positions rather than surveyed coordinates. Verify the current project record, design and address before relying on a location.
This watchlist supports client interaction and proposal follow-up. Check current status, fee and commercial details against Scoro before relying on them.
Last 30 days
More than 30 days
Live Briefing Watchlist
Use search and date filters to narrow the watchlist, then select any card to open its full briefing.
Live Briefing - detailed view:
Main ecological constraints
Latest Offsets*
Latest Indicative Offset Costs
Delivery position
Priority next steps
Client communication readiness
Safe to communicate now
Keep internal or provisional
Consultant hold point (ESEA App)
Latest project output
Archived project register
When a scheduled evidence review confirms that a project has closed or no longer belongs on the recent live-work watchlist, its final briefing snapshot will move here with its last reviewed date and closeout position.
Current briefing watchlist
Recent work signals from current deliverables, standalone project chats and the 2 September Metadata Log snapshot. Maroota remains the first fully developed briefing; these additional work streams are queued for status reconciliation and fuller briefings.
Love v DCCEEW · Woodlands remediation order
Draft VMP work remains open in the Metadata Log snapshot, with refreshed spatial evidence indicating continued technical activity.
GIS files updated 30 Sep · Metadata Log status requires current confirmationGrose River Bridge ecological management
The existing White-bellied Sea-Eagle work stream has fresh hold-letter and field-safety evidence under the newer project folder.
Ecological hold letter updated 30 Sep · linked project-number check neededSakkara Richards · north-western Spine Road FFIA
A standalone chat records final report QA and appendix corrections, while the Metadata Log snapshot describes an earlier completed VMP scope.
Final QA chat and FFIA files updated 30 Sep · confirm issue and next client step58 Kenthurst Road, Dural
Recent standalone work covers an amended Test of Significance and VMP, beyond the completed post-clearing scope recorded in the snapshot.
Standalone chat active 2 Oct · amended VMP/GIS files updated 30 Sep55–67 & 69–81 Lee Holm Road, St Marys
Fresh final BDAR and VMP files post-date the completed status in the Metadata Log snapshot and should be checked for issue or follow-up.
Final BDAR and VMP updated 30 Sep · current client-response state unknown15–17 Soma Avenue, Bowral BDAR
Version 4.1 final files indicate recent movement on a project previously recorded as completed, so closure and any outstanding response need checking.
V4.1 final PDF updated 30 Sep · confirm whether any client or authority action remainsActivity is not treated as proof that a project is live. The scheduled update verifies status against current correspondence, deliverables and the Metadata Log before promoting a work stream into a full briefing.
First live briefing · Project 20260280
4717 Old Northern Road Quarry, Maroota
A full BAM 2020 BDAR is in active evidence integration. Draft 1.0 is assembled; the current project risk sits in revised-design confirmation, targeted species evidence, habitat qualification and multidisciplinary inputs.
Use the current report for internal coordination only until the footprint, survey evidence and final BAM-C state are reviewed.
Delivery position
Drafting can continue, but final species, credit and impact conclusions remain gated by design, survey and specialist evidence.
Priority next steps
Obtain the revised plan, pit depth and ancillary footprint; confirm whether the proposal is standalone or functionally linked to adjoining operations.
Continue bat-device processing and manual review; verify recorder coordinates; complete targeted flora/fauna, habitat-feature and survey-track evidence.
Resolve zone-area discrepancies, repair final geometry, confirm PCT/zone limits and replace conditional proxy polygons with reviewed evidence.
Bring groundwater, surface water, contamination, noise, air, traffic and rehabilitation findings into prescribed, indirect and cumulative impact sections.
Export a fresh Development Change Report, reconcile credits and dependencies, then complete senior technical review and whole-report QA.
Consultant hold point (ESEA App)
Client communication readiness
A safe update can describe progress and required inputs without presenting provisional findings as final.
Safe to communicate now
- Six BAM plots and the initial ecological baseline have been completed.
- BDAR Draft 1.0 has been assembled against the current project layout.
- Vegetation mapping, BAM-C review and bat acoustic processing are progressing.
- The next revision depends on current design and outstanding technical inputs.
Keep internal or provisional
- Credit quantities, species absences and species polygons are not final.
- The 3.36 ha direct-impact account is tied to the current footprint.
- No final completion date should be promised until survey and specialist inputs are confirmed.
Client action: provide or confirm the revised design, standalone/combined pathway and outstanding multidisciplinary reports.
Briefing update rhythm
These scheduled tasks update the Workspace-only dashboard when material evidence changes. Automated staff or client email sending remains off until the recipient and approval workflow is agreed.
Source strategy
The live Metadata Log is the structured project index used at each scheduled refresh. Current NAS evidence, reliably matched OneNote notes and controlled App records are reconciled where relevant; the dashboard does not continuously read SharePoint or the NAS in a visitor's browser.