ESEA Overview

Current ESEA project portfolio snapshot.

Sourceinformation
ESEA Scoro
Unique clients
75
Across live and archived projects
Live projects
28
23% of visible projects
Projects completed
96
77% completion share
Total projects
124
Consolidated project records

Projects completed by month

Rolling 12 months
420

Project status

Current selection
124projects

Recently completed projects

Latest finalised dates
ProjectClientServiceCompletedLead
No projects match these filters.

Service mix

Projects by service

Recently completed deliverables

Top 5 by finalised date
DeliverableProjectClientServiceCompletedESEA Consultant
No completed deliverables match these filters.
Deliverables completed this FY
0
Since 1 July
Completion rate
0%
Completed share of visible deliverables
Median delivery*
—
Positive dated spans only
Live workload
0
Live deliverables

Delivery throughput

StartedCompletedProposals*

* Proposal points use the latest saved proposal/tender evidence date until Scoro reconciliation is connected.

Live team work by service

Deliverables by LGA

Current selection

Service status

Completion by service
ServiceDeliverablesCompletedLiveCompleted / Live / Unverified mix
Unique clients
0
Across live and archived projects
Repeat clients
0
Clients with more than one project
New clients this FY
0
First recorded live or archived project since 1 July
Projects per client
0
Average across visible clients

New clients by month

Rolling 12 months
420

Largest client portfolios

Projects by client

Client portfolio

Visible selection
ClientProjectsLiveCompletedServicesLatest activity
No clients match these filters.
Sydney
Global
New South Wales

Indicative location view. One primary project-level location is read from the accepted Metadata Log mapping table. Deliverable rows never create duplicate pins. Text-only and withheld locations remain listed for reconciliation, and some published pins are locality- or region-level positions rather than surveyed coordinates. Verify the current project record, design and address before relying on a location.

Internal ESEA proposal reference

This watchlist supports client interaction and proposal follow-up. Check current status, fee and commercial details against Scoro before relying on them.

Last 30 days

Recent proposal evidence
Proposal scan reviewed 18 November 2026

More than 30 days

Older proposals requiring Scoro status confirmation

Live Briefing Watchlist

Use search and date filters to narrow the watchlist, then select any card to open its full briefing.

10 selectable briefings

Live Briefing - detailed view:

Latest Saved Client Correspondence*: ESEA Consultant: * Based on the latest client or external email chain saved in the project Correspondence folder; it may not reflect unsaved emails and does not include video or in-person discussions.

    Main ecological constraints

    Current assessment findings

      Latest Offsets*

      Ecosystem credits
      Species credits

      * Indicative from current project documentation - consult the BOS Portal for live, updated information.

      Latest Indicative Offset Costs

      TBC

      Indicative internal estimate only — do not provide this information to clients unless it has been reviewed and clearly caveated as indicative.
      Historical registered prices are not current market quotations and do not confirm availability or current like-for-like eligibility.

      Delivery position

      Priority next steps

      Order protects downstream work

      Client communication readiness

      Consultant release required

      Safe to communicate now

        Keep internal or provisional

          Consultant hold point (ESEA App)

          AI does not approve

          Latest project output

          Key project controls
          Client: Urban City Planning Client project manager: Joshua Gullotto Email: lodgements@ucgteam.com.au
          Portfolio scan reviewed 5 October 2026Metadata snapshot · recent chats · NAS evidence

          Current briefing watchlist

          Recent work signals from current deliverables, standalone project chats and the 2 September Metadata Log snapshot. Maroota remains the first fully developed briefing; these additional work streams are queued for status reconciliation and fuller briefings.

          6 additional work streams
          20250177Metadata: live

          Love v DCCEEW · Woodlands remediation order

          Draft VMP work remains open in the Metadata Log snapshot, with refreshed spatial evidence indicating continued technical activity.

          GIS files updated 30 Sep · Metadata Log status requires current confirmation
          20240036 / 20260264Metadata: live

          Grose River Bridge ecological management

          The existing White-bellied Sea-Eagle work stream has fresh hold-letter and field-safety evidence under the newer project folder.

          Ecological hold letter updated 30 Sep · linked project-number check needed
          20250091Reconcile scope

          Sakkara Richards · north-western Spine Road FFIA

          A standalone chat records final report QA and appendix corrections, while the Metadata Log snapshot describes an earlier completed VMP scope.

          Final QA chat and FFIA files updated 30 Sep · confirm issue and next client step
          20250206Reconcile scope

          58 Kenthurst Road, Dural

          Recent standalone work covers an amended Test of Significance and VMP, beyond the completed post-clearing scope recorded in the snapshot.

          Standalone chat active 2 Oct · amended VMP/GIS files updated 30 Sep
          20260256Issue / closeout check

          55–67 & 69–81 Lee Holm Road, St Marys

          Fresh final BDAR and VMP files post-date the completed status in the Metadata Log snapshot and should be checked for issue or follow-up.

          Final BDAR and VMP updated 30 Sep · current client-response state unknown
          20260230Issue / closeout check

          15–17 Soma Avenue, Bowral BDAR

          Version 4.1 final files indicate recent movement on a project previously recorded as completed, so closure and any outstanding response need checking.

          V4.1 final PDF updated 30 Sep · confirm whether any client or authority action remains

          Activity is not treated as proof that a project is live. The scheduled update verifies status against current correspondence, deliverables and the Metadata Log before promoting a work stream into a full briefing.

          First live briefing · Project 20260280

          4717 Old Northern Road Quarry, Maroota

          A full BAM 2020 BDAR is in active evidence integration. Draft 1.0 is assembled; the current project risk sits in revised-design confirmation, targeted species evidence, habitat qualification and multidisciplinary inputs.

          BDAR / BAMDraft 1.0Evidence through 2 Oct 2026
          Needs attention Protect the draft from stale design and provisional species assumptions.

          Use the current report for internal coordination only until the footprint, survey evidence and final BAM-C state are reviewed.

          1. Confirm the revised quarry design and standalone/combined pathway.
          2. Continue bat-call analysis and complete targeted survey evidence.
          3. Reconcile vegetation-zone geometry, species polygons and BAM-C.
          Overall stageDraft 1.0Evidence integration in progress
          Latest material update2 Oct 2026Bat acoustic handover
          Current direct impact3.36 haProvisional · current footprint
          BAM-C caseOpen · Rev 0Not finalised or closed

          Delivery position

          From evidence, not folder activity alone

          Drafting can continue, but final species, credit and impact conclusions remain gated by design, survey and specialist evidence.

          ✓
          Project brief and pathway establishedFull BAM 2020 BDAR; designated-development pathway and agency requirements recorded.
          28 Aug
          ✓
          Field baseline and six BAM plots completedPlots, route notes, habitat features and three provisional vegetation zones assembled.
          11–16 Sep
          ✓
          PCT and vegetation-zone working modelPCT 3616 is preferred; PCT 3620 remains the leading alternative. Zone boundaries are still provisional.
          24 Sep
          4
          BAM-C and targeted species evidenceCase is open. Candidate, habitat and polygon entries preserve uncertainty and require further survey and assessor review.
          Active
          5
          BDAR Draft 1.0 and acoustic analysisFull report structure is assembled. One bat-device baseline is processed; remaining devices and expert call review continue.
          1–2 Oct
          6
          Draft 2.0, senior review and issueWaits on the current design, specialist inputs, completed surveys, final polygons and refreshed BAM-C export.
          Pending
          Aerial map of the 4717 Old Northern Road subject property showing vegetation zones, habitat features and the current impacted footprint
          Current working footprint and vegetation zonesDraft 1.0 figure dated 30 September 2026. Recheck after any design or zone revision.

          Priority next steps

          Order protects downstream work
          1
          Confirm the current quarry design and project pathway

          Obtain the revised plan, pit depth and ancillary footprint; confirm whether the proposal is standalone or functionally linked to adjoining operations.

          Project lead / UCP
          2
          Complete field and acoustic evidence

          Continue bat-device processing and manual review; verify recorder coordinates; complete targeted flora/fauna, habitat-feature and survey-track evidence.

          Fauna & field leads
          3
          Reconcile GIS, vegetation zones and species polygons

          Resolve zone-area discrepancies, repair final geometry, confirm PCT/zone limits and replace conditional proxy polygons with reviewed evidence.

          GIS / assessor
          4
          Integrate specialist studies and commitments

          Bring groundwater, surface water, contamination, noise, air, traffic and rehabilitation findings into prescribed, indirect and cumulative impact sections.

          Project team
          5
          Refresh BAM-C and prepare Draft 2.0

          Export a fresh Development Change Report, reconcile credits and dependencies, then complete senior technical review and whole-report QA.

          Assessor / reviewer

          Consultant hold point (ESEA App)

          AI does not approve
          HP01
          Current footprintRecheck when revised design arrives.
          Pending
          HP04
          QGIS projectReview geometry, areas and affected outputs.
          Review
          HP11
          Candidate speciesSurvey adequacy and return-visit decisions.
          Active
          HP10
          BAM-C saved stateApprove only after final evidence and export.
          Pending
          HP15
          Senior technical reviewDraft is not ready for external issue.
          Later
          HP16
          Final report reviewExact QA-checked version and release authority.
          Later

          Client communication readiness

          Consultant release required

          A safe update can describe progress and required inputs without presenting provisional findings as final.

          Safe to communicate now

          • Six BAM plots and the initial ecological baseline have been completed.
          • BDAR Draft 1.0 has been assembled against the current project layout.
          • Vegetation mapping, BAM-C review and bat acoustic processing are progressing.
          • The next revision depends on current design and outstanding technical inputs.

          Keep internal or provisional

          • Credit quantities, species absences and species polygons are not final.
          • The 3.36 ha direct-impact account is tied to the current footprint.
          • No final completion date should be promised until survey and specialist inputs are confirmed.

          Client action: provide or confirm the revised design, standalone/combined pathway and outstanding multidisciplinary reports.

          Briefing update rhythm

          Dashboard refresh scheduled
          Monday · 06:30 SydneyWindows scheduled reconciliation and publication, with daylight-saving-aware Sydney wall-clock timing.
          Wednesday · 19:15 SydneyWindows scheduled midweek reconciliation and publication, with the latest due cycle processed after sleep or shutdown.

          These scheduled tasks update the Workspace-only dashboard when material evidence changes. Automated staff or client email sending remains off until the recipient and approval workflow is agreed.

          Source strategy

          Current pilot → App target
          NAS project evidenceCurrent documents, GIS, correspondence and deliverables.
          App & project chatsRun handovers plus relevant standalone skill/agent work, verified against source files.
          Metadata LogScheduled project facts, owner, lifecycle, deliverable position and QA status from the live SharePoint workbook.
          Briefing dashboardHandover summary, evidence freshness and prioritised actions.
          Staff / client draftsEvidence-linked updates with consultant review before release.

          The live Metadata Log is the structured project index used at each scheduled refresh. Current NAS evidence, reliably matched OneNote notes and controlled App records are reconciled where relevant; the dashboard does not continuously read SharePoint or the NAS in a visitor's browser.

          Evidence freshness

          Key project controls
          BDAR Draft 1.0Complete structure with labelled open inputs and seven current GIS figures.
          1 Oct
          Acoustic analysis handoverESEA 4 baseline complete; remaining devices and expert review continue.
          2 Oct
          BAM-C Development Change ReportOpen case, Revision 0; outputs remain provisional.
          30 Sep
          QGIS project and species evidenceCurrent analytical geometry; final review needed after design/survey updates.
          30 Sep
          Project Metadata LogScheduled identity and lifecycle check; current project evidence still controls unsupported or conflicting technical detail.
          Scheduled